Basically a recap of the last week:
-My computer broke, so I sent it in for repairs.
-Bought the most powerful stock model that apple had in stock.
-Spent an entire night moving everything from my backup to the new computer and getting my thesis to work with it.
-Finished the application portion of the project.
-Created 2 animations and rendered them both.
-Dealt with multiple render crashes.
-Sent one animation SVA to render on their render servers.
-Composited all of the animations into one video.
-Created a sign out of EL wire to help advertise for my thesis at the showcase.
-Created my splash screen for the showcase.
-Lost a lot of sleep, money, and self motivation.
That's about it. I just have to prepare my pitch and presentation and do the video for the website. I have basically put in about 2 weeks worth or work and rendering into about 4 days. You should hopefully see my project running on the show floor next friday, as long as apple gets me my computer back before the show Leap motion wont give me another beta key which is currently running a few parts of my apps and my key is on my broken computer).
No comments:
Post a Comment